IATF 16949:2016 · ISO 9001:2015 Dera Bassi, Punjab · 4 manufacturing units
FORGING · MACHINING · ASSEMBLY · SINCE 2004

Forged and
precision-machined
drivetrain parts for
the world's OEMs.

Gears, shafts, spindles and levers for tractors, commercial vehicles and off-highway machines — engineered, forged, heat-treated, machined and inspected under one roof in Dera Bassi, Punjab.

Forging and manufacturing facility
Forging machinery
Forging machinery
0+

Years in forging, since 2004

0

Manufacturing units, Punjab &
Himachal Pradesh

0+

CNC and gear machines

0+

People

Certifications

ISO 9001 : 2015 | IATF 16949 : 2016 | ISO 14001: 2015 | ISO 45001 : 2018

TRUSTED BY
ONE PO, ONE ACCOUNTABLE PARTNER

Every process in-house, from die design to assembly-ready part.

Complete process control means shorter lead times, one quality system and no hand-offs between vendors. Forging envelope 1–70 kg.
Design and Die Shop

Design & Die Shop

CAD/CAE/CAM simulation and in-house die making on VMCs and CNC vertical lathes — new part development without external tooling vendors.

Explore
Forging

Forging

Air-operated PMI hammers, belt-drop hammers and a 1,600-ton screw press; 1–70 kg; 32,100 MT per annum.

Explore
Gear and Precision Machining

Gear & Precision Machining

300+ machines: hobbing, shaping, shaving, power skiving and Liebherr CBN tooth grinding to DIN 6; 8-axis Mazak Integrex, VTL, HMC, VMC.

Explore
Heat Treatment

Heat Treatment

46 pieces of SCADA-controlled equipment — sealed-quench carburising, press quenching and 28 induction hardeners — CQI-9 compliant.

Explore
Metrology

Qualitiy Assurance Metrology

Klingelnberg P40 and Osaka gear testers, CMM, optical measuring, roundness and contour tracing — every setup validated before release.

Explore
CERTIFIED SYSTEMS

IATF 16949:2016
ISO 9001:2015
ISO 14001 · ISO 45001
CQI-9

Audited by DQS Holding GmbH and by our OEM customers.

View certificates
2004 → 2026

From a 3,600 MT
forge shop to
4 expansive plants with 32,100 MT & 300 plus Machines

Full company timeline
2004

Unit I established at Dera Bassi with 3,600 MT annual capacity.

2010

Ashok Leyland onboarded — entry into commercial-vehicle components.

2014

Unit II — a greenfield plant dedicated to gear components.

2024

Unit III lifts capacity to 32,100 MT; 1,788 kWp captive solar follows in 2025.

INSIDE THE PLANTS

JPF at a Glance

Billet to finished gear: forging, heat treatment, gear cutting, grinding and inspection across Units I–III.